Rebate
Available
ramsey County · Minnesota
New Brighton is a suburban Ramsey County city with post-war and 1970s–1980s housing stock and strong community infrastructure. EV charger demand is growing as residents upgrade older homes, and the city's proximity to Arden Hills and Mounds View makes it a natural service territory.
Why New Brighton property owners choose us







Local snapshot
Every city has different housing patterns, parking layouts, and permitting rhythm. Here’s what we plan for first in New Brighton.
Residential garages, apartment carports, office ramps, and outdoor winter installs — a sample of completed work across the Twin Cities.








What we install
Residential and commercial charging solutions — permitted, inspected, and backed by a fixed-price written quote.

1960s–1990s single-family homes. Panel sizes range from 100–200A. Attached garages are common. Some older 100A panels need review.

Pricing
New Brighton installs typically run $950–$1,600. Panel review is standard; upgrades needed on some older homes.
Level 2 charger install
$800–$1,200Standard circuit, existing panel capacity
Extended conduit run
$1,200–$1,900Longer run to detached garage or subpanel feed
Panel upgrade + charger
$2,500–$4,500100A → 200A service upgrade with EV circuit
Commercial per-station
$3,000–$12,000+Varies by site prep, trenching, and quantity
Prices are estimates based on typical New Brighton projects. Actual cost depends on panel capacity, circuit distance, and charger model.
A clear, four-step process — from first contact to charging at home or at your business.
Share your charger goals, parking setup, and panel details to get a clear next-step recommendation from a local specialist.
Licensed · permitted · inspected · no surprises
EV compatibility & charge times
27 brands, 96+ configurations. Select your vehicle for overnight charge estimates and charger recommendations.
96 vehicles
| Vehicle | Year | Connector | Overnight |
|---|---|---|---|
| Tesla Model 3 | 2017–2025 | NACS | 100% |
| Tesla Model Y | 2020–2025 | NACS | 100% |
| Tesla Model S | 2012–2025 | NACS | 92% |
| Tesla Model X | 2015–2025 | NACS | 92% |
| Tesla Cybertruck | 2024–2025 | NACS | 75% |
| Ford Mustang Mach-E | 2021–2024 | CCS1 | 92% |
| Ford Mustang Mach-E | 2025 | NACS | 92% |
| Ford F-150 Lightning | 2022–2024 | CCS1 | 100% |
| Ford F-150 Lightning | 2025 | NACS | 100% |
| Chevrolet Bolt EV | 2017–2023 | CCS1 | 95% |
| Chevrolet Bolt EUV | 2022–2023 | CCS1 | 95% |
| Chevrolet Equinox EV | 2024 | CCS1 | 100% |
| Chevrolet Equinox EV | 2025 | NACS | 100% |
| Chevrolet Blazer EV | 2024 | CCS1 | 90% |
| Chevrolet Blazer EV | 2025 | NACS | 90% |
| Chevrolet Silverado EV | 2024 | CCS1 | 77% |
| Chevrolet Silverado EV | 2025 | NACS | 77% |
| GMC Hummer EV | 2022–2024 | CCS1 | 72% |
| GMC Hummer EV | 2025 | NACS | 72% |
| GMC Sierra EV | 2024 | CCS1 | 77% |
| GMC Sierra EV | 2025 | NACS | 77% |
| Cadillac Lyriq | 2023–2024 | CCS1 | 90% |
| Cadillac Lyriq | 2025 | NACS | 90% |
| Rivian R1T | 2022–2024 | CCS1 | 68% |
| Rivian R1T | 2025 | NACS | 68% |
| Rivian R1S | 2022–2024 | CCS1 | 68% |
| Rivian R1S | 2025 | NACS | 68% |
| Lucid Air | 2022–2024 | CCS1 | 100% |
| Lucid Air | 2025 | NACS | 100% |
| Hyundai Ioniq 5 | 2022–2024 | CCS1 | 100% |
| Hyundai Ioniq 5 | 2025 | NACS | 100% |
| Hyundai Ioniq 6 | 2023–2024 | CCS1 | 100% |
| Hyundai Ioniq 6 | 2025 | NACS | 100% |
| Hyundai Kona Electric | 2019–2024 | CCS1 | 90% |
| Kia EV6 | 2022–2024 | CCS1 | 100% |
| Kia EV6 | 2025 | NACS | 100% |
| Kia EV9 | 2024 | CCS1 | 88% |
| Kia EV9 | 2025 | NACS | 88% |
| Kia Niro EV | 2019–2024 | CCS1 | 90% |
| Genesis GV60 | 2023–2024 | CCS1 | 100% |
| Genesis GV60 | 2025 | NACS | 100% |
| Genesis Electrified GV70 | 2023–2024 | CCS1 | 100% |
| Genesis Electrified G80 | 2023–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2021–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2025 | NACS | 100% |
| Volkswagen ID.Buzz | 2024 | CCS1 | 97% |
| Volkswagen ID.Buzz | 2025 | NACS | 97% |
| Audi e-tron | 2019–2023 | CCS1 | 81% |
| Audi e-tron GT | 2022–2024 | CCS1 | 83% |
| Audi Q4 e-tron | 2022–2024 | CCS1 | 100% |
| Audi Q8 e-tron | 2024–2025 | CCS1 | 72% |
| Porsche Taycan | 2020–2025 | CCS1 | 83% |
| Porsche Macan Electric | 2024–2025 | CCS1 | 88% |
| BMW iX | 2022–2024 | CCS1 | 84% |
| BMW iX | 2025 | NACS | 84% |
| BMW i4 | 2022–2024 | CCS1 | 100% |
| BMW i4 | 2025 | NACS | 100% |
| BMW i5 | 2024 | CCS1 | 100% |
| BMW i5 | 2025 | NACS | 100% |
| BMW i7 | 2023–2024 | CCS1 | 86% |
| BMW i7 | 2025 | NACS | 86% |
| Mercedes-Benz EQS | 2022–2024 | CCS1 | 71% |
| Mercedes-Benz EQS | 2025 | NACS | 71% |
| Mercedes-Benz EQE | 2023–2024 | CCS1 | 84% |
| Mercedes-Benz EQE | 2025 | NACS | 84% |
| Mercedes-Benz EQB | 2022–2024 | CCS1 | 100% |
| Mercedes-Benz EQS SUV | 2023–2024 | CCS1 | |
| Mercedes-Benz EQE SUV | 2023–2024 | CCS1 | |
| Nissan Leaf | 2011–2024 | J1772 | 100% |
| Nissan Ariya | 2023–2024 | CCS1 | 71% |
| Nissan Ariya | 2025 | NACS | 71% |
| Toyota bZ4X | 2023–2024 | CCS1 | 73% |
| Toyota bZ4X | 2025 | NACS | 73% |
| Subaru Solterra | 2023–2024 | CCS1 | 73% |
| Subaru Solterra | 2025 | NACS | 73% |
| Honda Prologue | 2024 | CCS1 | 100% |
| Honda Prologue | 2025 | NACS | 100% |
| Volvo XC40 Recharge | 2021–2024 | CCS1 | 100% |
| Volvo XC40 Recharge | 2025 | NACS | 100% |
| Volvo C40 Recharge | 2022–2024 | CCS1 | 100% |
| Volvo C40 Recharge | 2025 | NACS | 100% |
| Volvo EX90 | 2024 | CCS1 | 79% |
| Volvo EX90 | 2025 | NACS | 79% |
| Polestar Polestar 2 | 2021–2024 | CCS1 | 100% |
| Polestar Polestar 2 | 2025 | NACS | 100% |
| Polestar Polestar 3 | 2024 | CCS1 | 79% |
| Polestar Polestar 3 | 2025 | NACS | 79% |
| Mini Cooper SE | 2020–2024 | CCS1 | 100% |
| Mini Cooper SE | 2025 | NACS | 100% |
| Mazda MX-30 | 2022–2024 | CCS1 | 100% |
| Jaguar I-PACE | 2019–2024 | CCS1 | 98% |
| Lexus RZ 450e | 2023–2024 | CCS1 | 73% |
| Lexus RZ 450e | 2025 | NACS | 73% |
| Fisker Ocean | 2023–2024 | CCS1 | 78% |
| VinFast VF 8 | 2023–2024 | CCS1 | 100% |
| VinFast VF 9 | 2023–2024 | CCS1 | 72% |
Common questions from New Brighton homeowners, property managers, and business owners.
Often yes — we calculate existing load and verify available breaker slots before recommending any panel work. Many 100A homes qualify as-is.
A hardwired 48A charger (on a 60A dedicated circuit) delivers the fastest home charging — about 37 miles per hour for most EVs.
We pull an electrical permit with the City of New Brighton and coordinate the inspection. You don't need to manage any paperwork.
Yes. A licensed electrician must pull an electrical permit for a new Level 2 circuit. We manage permit filing, inspection coordination, and final sign-off.
Most residential projects are completed in one visit. Longer conduit runs, panel modifications, or scheduling constraints can extend total timeline.
Yes. We regularly install in detached garages, driveways, and weather-exposed areas using code-compliant wiring methods and appropriately rated equipment.
We install major residential and commercial brands including Tesla Wall Connector, ChargePoint, Emporia, Wallbox, and similar UL-listed hardware.
Reviews
Real reviews from homeowners and businesses near you.
Getting the charger into my finished basement garage took planning. The installer mapped the conduit route, upsized the wire for voltage drop, and passed inspection on the first attempt.
We added a charger when we remodeled the garage. They roughed in the circuit during framing and came back to mount the unit after drywall. Perfect coordination with our contractor.
The electrician found that our garage subpanel was undersized for the charger load. He upgraded it as part of the project and now we have room for future circuits too.
Their website had transparent pricing ranges before I even called. The actual quote was within that range, which built trust. Install matched the quote. No games.