Rebate
Available
washington County · Minnesota
Oak Park Heights is a commercial and residential Washington County city adjacent to Stillwater, known for its commercial development along Highway 36 and growing suburban residential neighborhoods. Both residential and commercial charger demand are active here.
Why Oak Park Heights property owners choose us







Local snapshot
Every city has different housing patterns, parking layouts, and permitting rhythm. Here’s what we plan for first in Oak Park Heights.
Residential garages, apartment carports, office ramps, and outdoor winter installs — a sample of completed work across the Twin Cities.








What we install
Residential and commercial charging solutions — permitted, inspected, and backed by a fixed-price written quote.

Mix of 1980s–2000s single-family homes with 150–200A panels. Commercial sites along the Highway 36 corridor are a growing focus.

Pricing
Residential installs in Oak Park Heights run $950–$1,500. Commercial projects are scoped individually.
Level 2 charger install
$800–$1,200Standard circuit, existing panel capacity
Extended conduit run
$1,200–$1,900Longer run to detached garage or subpanel feed
Panel upgrade + charger
$2,500–$4,500100A → 200A service upgrade with EV circuit
Commercial per-station
$3,000–$12,000+Varies by site prep, trenching, and quantity
Prices are estimates based on typical Oak Park Heights projects. Actual cost depends on panel capacity, circuit distance, and charger model.
A clear, four-step process — from first contact to charging at home or at your business.
Share your charger goals, parking setup, and panel details to get a clear next-step recommendation from a local specialist.
Licensed · permitted · inspected · no surprises
EV compatibility & charge times
27 brands, 96+ configurations. Select your vehicle for overnight charge estimates and charger recommendations.
96 vehicles
| Vehicle | Year | Connector | Overnight |
|---|---|---|---|
| Tesla Model 3 | 2017–2025 | NACS | 100% |
| Tesla Model Y | 2020–2025 | NACS | 100% |
| Tesla Model S | 2012–2025 | NACS | 92% |
| Tesla Model X | 2015–2025 | NACS | 92% |
| Tesla Cybertruck | 2024–2025 | NACS | 75% |
| Ford Mustang Mach-E | 2021–2024 | CCS1 | 92% |
| Ford Mustang Mach-E | 2025 | NACS | 92% |
| Ford F-150 Lightning | 2022–2024 | CCS1 | 100% |
| Ford F-150 Lightning | 2025 | NACS | 100% |
| Chevrolet Bolt EV | 2017–2023 | CCS1 | 95% |
| Chevrolet Bolt EUV | 2022–2023 | CCS1 | 95% |
| Chevrolet Equinox EV | 2024 | CCS1 | 100% |
| Chevrolet Equinox EV | 2025 | NACS | 100% |
| Chevrolet Blazer EV | 2024 | CCS1 | 90% |
| Chevrolet Blazer EV | 2025 | NACS | 90% |
| Chevrolet Silverado EV | 2024 | CCS1 | 77% |
| Chevrolet Silverado EV | 2025 | NACS | 77% |
| GMC Hummer EV | 2022–2024 | CCS1 | 72% |
| GMC Hummer EV | 2025 | NACS | 72% |
| GMC Sierra EV | 2024 | CCS1 | 77% |
| GMC Sierra EV | 2025 | NACS | 77% |
| Cadillac Lyriq | 2023–2024 | CCS1 | 90% |
| Cadillac Lyriq | 2025 | NACS | 90% |
| Rivian R1T | 2022–2024 | CCS1 | 68% |
| Rivian R1T | 2025 | NACS | 68% |
| Rivian R1S | 2022–2024 | CCS1 | 68% |
| Rivian R1S | 2025 | NACS | 68% |
| Lucid Air | 2022–2024 | CCS1 | 100% |
| Lucid Air | 2025 | NACS | 100% |
| Hyundai Ioniq 5 | 2022–2024 | CCS1 | 100% |
| Hyundai Ioniq 5 | 2025 | NACS | 100% |
| Hyundai Ioniq 6 | 2023–2024 | CCS1 | 100% |
| Hyundai Ioniq 6 | 2025 | NACS | 100% |
| Hyundai Kona Electric | 2019–2024 | CCS1 | 90% |
| Kia EV6 | 2022–2024 | CCS1 | 100% |
| Kia EV6 | 2025 | NACS | 100% |
| Kia EV9 | 2024 | CCS1 | 88% |
| Kia EV9 | 2025 | NACS | 88% |
| Kia Niro EV | 2019–2024 | CCS1 | 90% |
| Genesis GV60 | 2023–2024 | CCS1 | 100% |
| Genesis GV60 | 2025 | NACS | 100% |
| Genesis Electrified GV70 | 2023–2024 | CCS1 | 100% |
| Genesis Electrified G80 | 2023–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2021–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2025 | NACS | 100% |
| Volkswagen ID.Buzz | 2024 | CCS1 | 97% |
| Volkswagen ID.Buzz | 2025 | NACS | 97% |
| Audi e-tron | 2019–2023 | CCS1 | 81% |
| Audi e-tron GT | 2022–2024 | CCS1 | 83% |
| Audi Q4 e-tron | 2022–2024 | CCS1 | 100% |
| Audi Q8 e-tron | 2024–2025 | CCS1 | 72% |
| Porsche Taycan | 2020–2025 | CCS1 | 83% |
| Porsche Macan Electric | 2024–2025 | CCS1 | 88% |
| BMW iX | 2022–2024 | CCS1 | 84% |
| BMW iX | 2025 | NACS | 84% |
| BMW i4 | 2022–2024 | CCS1 | 100% |
| BMW i4 | 2025 | NACS | 100% |
| BMW i5 | 2024 | CCS1 | 100% |
| BMW i5 | 2025 | NACS | 100% |
| BMW i7 | 2023–2024 | CCS1 | 86% |
| BMW i7 | 2025 | NACS | 86% |
| Mercedes-Benz EQS | 2022–2024 | CCS1 | 71% |
| Mercedes-Benz EQS | 2025 | NACS | 71% |
| Mercedes-Benz EQE | 2023–2024 | CCS1 | 84% |
| Mercedes-Benz EQE | 2025 | NACS | 84% |
| Mercedes-Benz EQB | 2022–2024 | CCS1 | 100% |
| Mercedes-Benz EQS SUV | 2023–2024 | CCS1 | |
| Mercedes-Benz EQE SUV | 2023–2024 | CCS1 | |
| Nissan Leaf | 2011–2024 | J1772 | 100% |
| Nissan Ariya | 2023–2024 | CCS1 | 71% |
| Nissan Ariya | 2025 | NACS | 71% |
| Toyota bZ4X | 2023–2024 | CCS1 | 73% |
| Toyota bZ4X | 2025 | NACS | 73% |
| Subaru Solterra | 2023–2024 | CCS1 | 73% |
| Subaru Solterra | 2025 | NACS | 73% |
| Honda Prologue | 2024 | CCS1 | 100% |
| Honda Prologue | 2025 | NACS | 100% |
| Volvo XC40 Recharge | 2021–2024 | CCS1 | 100% |
| Volvo XC40 Recharge | 2025 | NACS | 100% |
| Volvo C40 Recharge | 2022–2024 | CCS1 | 100% |
| Volvo C40 Recharge | 2025 | NACS | 100% |
| Volvo EX90 | 2024 | CCS1 | 79% |
| Volvo EX90 | 2025 | NACS | 79% |
| Polestar Polestar 2 | 2021–2024 | CCS1 | 100% |
| Polestar Polestar 2 | 2025 | NACS | 100% |
| Polestar Polestar 3 | 2024 | CCS1 | 79% |
| Polestar Polestar 3 | 2025 | NACS | 79% |
| Mini Cooper SE | 2020–2024 | CCS1 | 100% |
| Mini Cooper SE | 2025 | NACS | 100% |
| Mazda MX-30 | 2022–2024 | CCS1 | 100% |
| Jaguar I-PACE | 2019–2024 | CCS1 | 98% |
| Lexus RZ 450e | 2023–2024 | CCS1 | 73% |
| Lexus RZ 450e | 2025 | NACS | 73% |
| Fisker Ocean | 2023–2024 | CCS1 | 78% |
| VinFast VF 8 | 2023–2024 | CCS1 | 100% |
| VinFast VF 9 | 2023–2024 | CCS1 | 72% |
Common questions from Oak Park Heights homeowners, property managers, and business owners.
Yes — we design and install commercial Level 2 charging solutions for businesses along Highway 36 and throughout Oak Park Heights.
Yes — most residential installs are scheduled within 1–2 weeks of site assessment.
Yes — Oak Park Heights is a core part of our Washington County coverage area.
Yes. A licensed electrician must pull an electrical permit for a new Level 2 circuit. We manage permit filing, inspection coordination, and final sign-off.
Most residential projects are completed in one visit. Longer conduit runs, panel modifications, or scheduling constraints can extend total timeline.
Yes. We regularly install in detached garages, driveways, and weather-exposed areas using code-compliant wiring methods and appropriately rated equipment.
We install major residential and commercial brands including Tesla Wall Connector, ChargePoint, Emporia, Wallbox, and similar UL-listed hardware.
Reviews
Real reviews from homeowners and businesses near you.
Hillside home with the garage at street level and the panel upstairs. They ran conduit through a chase and made what could have been a complex project look straightforward.
The St. Croix valley gets brutal cold. They recommended a charger with a thermal management system and it charges reliably even at negative twenty. Right product for our climate.
Had them add a 240V outlet for a space heater and the EV charger on separate circuits from a new subpanel. Both projects done in one visit with one permit. Smart bundling.
We live on a bluff with limited access. The crew carried all materials up by hand without complaint. Hard-working team that doesn't cut corners even when conditions are difficult.