Rebate
Available
washington County · Minnesota
Oakdale is a substantial Washington County suburb adjacent to St. Paul, with 1970s–2000s residential neighborhoods, strong commercial corridors along I-694, and a growing EV-owning population. Its mix of housing ages means panel sizes vary across neighborhoods.
Why Oakdale property owners choose us







Local snapshot
Every city has different housing patterns, parking layouts, and permitting rhythm. Here’s what we plan for first in Oakdale.
Residential garages, apartment carports, office ramps, and outdoor winter installs — a sample of completed work across the Twin Cities.








What we install
Residential and commercial charging solutions — permitted, inspected, and backed by a fixed-price written quote.

1970s–2000s single-family homes with 150–200A panels. Attached garages are standard. Older northwest sections have 100A panels.

Pricing
Oakdale installs typically run $950–$1,600. Older neighborhoods may need panel review.
Level 2 charger install
$800–$1,200Standard circuit, existing panel capacity
Extended conduit run
$1,200–$1,900Longer run to detached garage or subpanel feed
Panel upgrade + charger
$2,500–$4,500100A → 200A service upgrade with EV circuit
Commercial per-station
$3,000–$12,000+Varies by site prep, trenching, and quantity
Prices are estimates based on typical Oakdale projects. Actual cost depends on panel capacity, circuit distance, and charger model.
A clear, four-step process — from first contact to charging at home or at your business.
Share your charger goals, parking setup, and panel details to get a clear next-step recommendation from a local specialist.
Licensed · permitted · inspected · no surprises
EV compatibility & charge times
27 brands, 96+ configurations. Select your vehicle for overnight charge estimates and charger recommendations.
96 vehicles
| Vehicle | Year | Connector | Overnight |
|---|---|---|---|
| Tesla Model 3 | 2017–2025 | NACS | 100% |
| Tesla Model Y | 2020–2025 | NACS | 100% |
| Tesla Model S | 2012–2025 | NACS | 92% |
| Tesla Model X | 2015–2025 | NACS | 92% |
| Tesla Cybertruck | 2024–2025 | NACS | 75% |
| Ford Mustang Mach-E | 2021–2024 | CCS1 | 92% |
| Ford Mustang Mach-E | 2025 | NACS | 92% |
| Ford F-150 Lightning | 2022–2024 | CCS1 | 100% |
| Ford F-150 Lightning | 2025 | NACS | 100% |
| Chevrolet Bolt EV | 2017–2023 | CCS1 | 95% |
| Chevrolet Bolt EUV | 2022–2023 | CCS1 | 95% |
| Chevrolet Equinox EV | 2024 | CCS1 | 100% |
| Chevrolet Equinox EV | 2025 | NACS | 100% |
| Chevrolet Blazer EV | 2024 | CCS1 | 90% |
| Chevrolet Blazer EV | 2025 | NACS | 90% |
| Chevrolet Silverado EV | 2024 | CCS1 | 77% |
| Chevrolet Silverado EV | 2025 | NACS | 77% |
| GMC Hummer EV | 2022–2024 | CCS1 | 72% |
| GMC Hummer EV | 2025 | NACS | 72% |
| GMC Sierra EV | 2024 | CCS1 | 77% |
| GMC Sierra EV | 2025 | NACS | 77% |
| Cadillac Lyriq | 2023–2024 | CCS1 | 90% |
| Cadillac Lyriq | 2025 | NACS | 90% |
| Rivian R1T | 2022–2024 | CCS1 | 68% |
| Rivian R1T | 2025 | NACS | 68% |
| Rivian R1S | 2022–2024 | CCS1 | 68% |
| Rivian R1S | 2025 | NACS | 68% |
| Lucid Air | 2022–2024 | CCS1 | 100% |
| Lucid Air | 2025 | NACS | 100% |
| Hyundai Ioniq 5 | 2022–2024 | CCS1 | 100% |
| Hyundai Ioniq 5 | 2025 | NACS | 100% |
| Hyundai Ioniq 6 | 2023–2024 | CCS1 | 100% |
| Hyundai Ioniq 6 | 2025 | NACS | 100% |
| Hyundai Kona Electric | 2019–2024 | CCS1 | 90% |
| Kia EV6 | 2022–2024 | CCS1 | 100% |
| Kia EV6 | 2025 | NACS | 100% |
| Kia EV9 | 2024 | CCS1 | 88% |
| Kia EV9 | 2025 | NACS | 88% |
| Kia Niro EV | 2019–2024 | CCS1 | 90% |
| Genesis GV60 | 2023–2024 | CCS1 | 100% |
| Genesis GV60 | 2025 | NACS | 100% |
| Genesis Electrified GV70 | 2023–2024 | CCS1 | 100% |
| Genesis Electrified G80 | 2023–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2021–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2025 | NACS | 100% |
| Volkswagen ID.Buzz | 2024 | CCS1 | 97% |
| Volkswagen ID.Buzz | 2025 | NACS | 97% |
| Audi e-tron | 2019–2023 | CCS1 | 81% |
| Audi e-tron GT | 2022–2024 | CCS1 | 83% |
| Audi Q4 e-tron | 2022–2024 | CCS1 | 100% |
| Audi Q8 e-tron | 2024–2025 | CCS1 | 72% |
| Porsche Taycan | 2020–2025 | CCS1 | 83% |
| Porsche Macan Electric | 2024–2025 | CCS1 | 88% |
| BMW iX | 2022–2024 | CCS1 | 84% |
| BMW iX | 2025 | NACS | 84% |
| BMW i4 | 2022–2024 | CCS1 | 100% |
| BMW i4 | 2025 | NACS | 100% |
| BMW i5 | 2024 | CCS1 | 100% |
| BMW i5 | 2025 | NACS | 100% |
| BMW i7 | 2023–2024 | CCS1 | 86% |
| BMW i7 | 2025 | NACS | 86% |
| Mercedes-Benz EQS | 2022–2024 | CCS1 | 71% |
| Mercedes-Benz EQS | 2025 | NACS | 71% |
| Mercedes-Benz EQE | 2023–2024 | CCS1 | 84% |
| Mercedes-Benz EQE | 2025 | NACS | 84% |
| Mercedes-Benz EQB | 2022–2024 | CCS1 | 100% |
| Mercedes-Benz EQS SUV | 2023–2024 | CCS1 | |
| Mercedes-Benz EQE SUV | 2023–2024 | CCS1 | |
| Nissan Leaf | 2011–2024 | J1772 | 100% |
| Nissan Ariya | 2023–2024 | CCS1 | 71% |
| Nissan Ariya | 2025 | NACS | 71% |
| Toyota bZ4X | 2023–2024 | CCS1 | 73% |
| Toyota bZ4X | 2025 | NACS | 73% |
| Subaru Solterra | 2023–2024 | CCS1 | 73% |
| Subaru Solterra | 2025 | NACS | 73% |
| Honda Prologue | 2024 | CCS1 | 100% |
| Honda Prologue | 2025 | NACS | 100% |
| Volvo XC40 Recharge | 2021–2024 | CCS1 | 100% |
| Volvo XC40 Recharge | 2025 | NACS | 100% |
| Volvo C40 Recharge | 2022–2024 | CCS1 | 100% |
| Volvo C40 Recharge | 2025 | NACS | 100% |
| Volvo EX90 | 2024 | CCS1 | 79% |
| Volvo EX90 | 2025 | NACS | 79% |
| Polestar Polestar 2 | 2021–2024 | CCS1 | 100% |
| Polestar Polestar 2 | 2025 | NACS | 100% |
| Polestar Polestar 3 | 2024 | CCS1 | 79% |
| Polestar Polestar 3 | 2025 | NACS | 79% |
| Mini Cooper SE | 2020–2024 | CCS1 | 100% |
| Mini Cooper SE | 2025 | NACS | 100% |
| Mazda MX-30 | 2022–2024 | CCS1 | 100% |
| Jaguar I-PACE | 2019–2024 | CCS1 | 98% |
| Lexus RZ 450e | 2023–2024 | CCS1 | 73% |
| Lexus RZ 450e | 2025 | NACS | 73% |
| Fisker Ocean | 2023–2024 | CCS1 | 78% |
| VinFast VF 8 | 2023–2024 | CCS1 | 100% |
| VinFast VF 9 | 2023–2024 | CCS1 | 72% |
Common questions from Oakdale homeowners, property managers, and business owners.
Often yes — we calculate your existing electrical load first. Many 100A panels have room for a 30A charger circuit without an upgrade.
Yes — we design and install commercial Level 2 charging solutions for Oakdale's business parks and retail centers.
Yes — the City of Oakdale requires an electrical permit. We handle the permit and inspection.
Yes. A licensed electrician must pull an electrical permit for a new Level 2 circuit. We manage permit filing, inspection coordination, and final sign-off.
Most residential projects are completed in one visit. Longer conduit runs, panel modifications, or scheduling constraints can extend total timeline.
Yes. We regularly install in detached garages, driveways, and weather-exposed areas using code-compliant wiring methods and appropriately rated equipment.
We install major residential and commercial brands including Tesla Wall Connector, ChargePoint, Emporia, Wallbox, and similar UL-listed hardware.
Reviews
Real reviews from homeowners and businesses near you.
Split-level with the garage on the lower level. They ran the circuit through the rim joist and into the garage ceiling. Short path, no exposed interior conduit. Clean solution.
We rent part of our duplex and needed the EV charger metered to our unit only. They installed a sub-meter so we pay exactly for what we use. Fair for everyone involved.
The tech arrived, laid out all materials neatly, worked systematically, and left zero mess. My husband, a retired tradesman, said it was the cleanest electrical work he has seen.
Added a charger when we finished the garage conversion. They coordinated with our insulation contractor to ensure the wire was in place before the walls closed up. Good teamwork.