Rebate
Available
hennepin County · Minnesota
Long Lake is a small, affluent community on Long Lake's north shore with classic suburban estates and a closely-knit residential character. Installs here typically involve well-maintained properties with 200A panels and are among the most straightforward in western Hennepin County.
Why Long Lake property owners choose us







Local snapshot
Every city has different housing patterns, parking layouts, and permitting rhythm. Here’s what we plan for first in Long Lake.
Residential garages, apartment carports, office ramps, and outdoor winter installs — a sample of completed work across the Twin Cities.








What we install
Residential and commercial charging solutions — permitted, inspected, and backed by a fixed-price written quote.

Well-maintained 1970s–2000s homes with 150–200A panels and attached garages. Minimal complexity — clean installs are the norm.

Pricing
Long Lake installs typically run $900–$1,400. Very few properties here require panel upgrades.
Level 2 charger install
$800–$1,200Standard circuit, existing panel capacity
Extended conduit run
$1,200–$1,900Longer run to detached garage or subpanel feed
Panel upgrade + charger
$2,500–$4,500100A → 200A service upgrade with EV circuit
Commercial per-station
$3,000–$12,000+Varies by site prep, trenching, and quantity
Prices are estimates based on typical Long Lake projects. Actual cost depends on panel capacity, circuit distance, and charger model.
A clear, four-step process — from first contact to charging at home or at your business.
Share your charger goals, parking setup, and panel details to get a clear next-step recommendation from a local specialist.
Licensed · permitted · inspected · no surprises
EV compatibility & charge times
27 brands, 96+ configurations. Select your vehicle for overnight charge estimates and charger recommendations.
96 vehicles
| Vehicle | Year | Connector | Overnight |
|---|---|---|---|
| Tesla Model 3 | 2017–2025 | NACS | 100% |
| Tesla Model Y | 2020–2025 | NACS | 100% |
| Tesla Model S | 2012–2025 | NACS | 92% |
| Tesla Model X | 2015–2025 | NACS | 92% |
| Tesla Cybertruck | 2024–2025 | NACS | 75% |
| Ford Mustang Mach-E | 2021–2024 | CCS1 | 92% |
| Ford Mustang Mach-E | 2025 | NACS | 92% |
| Ford F-150 Lightning | 2022–2024 | CCS1 | 100% |
| Ford F-150 Lightning | 2025 | NACS | 100% |
| Chevrolet Bolt EV | 2017–2023 | CCS1 | 95% |
| Chevrolet Bolt EUV | 2022–2023 | CCS1 | 95% |
| Chevrolet Equinox EV | 2024 | CCS1 | 100% |
| Chevrolet Equinox EV | 2025 | NACS | 100% |
| Chevrolet Blazer EV | 2024 | CCS1 | 90% |
| Chevrolet Blazer EV | 2025 | NACS | 90% |
| Chevrolet Silverado EV | 2024 | CCS1 | 77% |
| Chevrolet Silverado EV | 2025 | NACS | 77% |
| GMC Hummer EV | 2022–2024 | CCS1 | 72% |
| GMC Hummer EV | 2025 | NACS | 72% |
| GMC Sierra EV | 2024 | CCS1 | 77% |
| GMC Sierra EV | 2025 | NACS | 77% |
| Cadillac Lyriq | 2023–2024 | CCS1 | 90% |
| Cadillac Lyriq | 2025 | NACS | 90% |
| Rivian R1T | 2022–2024 | CCS1 | 68% |
| Rivian R1T | 2025 | NACS | 68% |
| Rivian R1S | 2022–2024 | CCS1 | 68% |
| Rivian R1S | 2025 | NACS | 68% |
| Lucid Air | 2022–2024 | CCS1 | 100% |
| Lucid Air | 2025 | NACS | 100% |
| Hyundai Ioniq 5 | 2022–2024 | CCS1 | 100% |
| Hyundai Ioniq 5 | 2025 | NACS | 100% |
| Hyundai Ioniq 6 | 2023–2024 | CCS1 | 100% |
| Hyundai Ioniq 6 | 2025 | NACS | 100% |
| Hyundai Kona Electric | 2019–2024 | CCS1 | 90% |
| Kia EV6 | 2022–2024 | CCS1 | 100% |
| Kia EV6 | 2025 | NACS | 100% |
| Kia EV9 | 2024 | CCS1 | 88% |
| Kia EV9 | 2025 | NACS | 88% |
| Kia Niro EV | 2019–2024 | CCS1 | 90% |
| Genesis GV60 | 2023–2024 | CCS1 | 100% |
| Genesis GV60 | 2025 | NACS | 100% |
| Genesis Electrified GV70 | 2023–2024 | CCS1 | 100% |
| Genesis Electrified G80 | 2023–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2021–2024 | CCS1 | 100% |
| Volkswagen ID.4 | 2025 | NACS | 100% |
| Volkswagen ID.Buzz | 2024 | CCS1 | 97% |
| Volkswagen ID.Buzz | 2025 | NACS | 97% |
| Audi e-tron | 2019–2023 | CCS1 | 81% |
| Audi e-tron GT | 2022–2024 | CCS1 | 83% |
| Audi Q4 e-tron | 2022–2024 | CCS1 | 100% |
| Audi Q8 e-tron | 2024–2025 | CCS1 | 72% |
| Porsche Taycan | 2020–2025 | CCS1 | 83% |
| Porsche Macan Electric | 2024–2025 | CCS1 | 88% |
| BMW iX | 2022–2024 | CCS1 | 84% |
| BMW iX | 2025 | NACS | 84% |
| BMW i4 | 2022–2024 | CCS1 | 100% |
| BMW i4 | 2025 | NACS | 100% |
| BMW i5 | 2024 | CCS1 | 100% |
| BMW i5 | 2025 | NACS | 100% |
| BMW i7 | 2023–2024 | CCS1 | 86% |
| BMW i7 | 2025 | NACS | 86% |
| Mercedes-Benz EQS | 2022–2024 | CCS1 | 71% |
| Mercedes-Benz EQS | 2025 | NACS | 71% |
| Mercedes-Benz EQE | 2023–2024 | CCS1 | 84% |
| Mercedes-Benz EQE | 2025 | NACS | 84% |
| Mercedes-Benz EQB | 2022–2024 | CCS1 | 100% |
| Mercedes-Benz EQS SUV | 2023–2024 | CCS1 | |
| Mercedes-Benz EQE SUV | 2023–2024 | CCS1 | |
| Nissan Leaf | 2011–2024 | J1772 | 100% |
| Nissan Ariya | 2023–2024 | CCS1 | 71% |
| Nissan Ariya | 2025 | NACS | 71% |
| Toyota bZ4X | 2023–2024 | CCS1 | 73% |
| Toyota bZ4X | 2025 | NACS | 73% |
| Subaru Solterra | 2023–2024 | CCS1 | 73% |
| Subaru Solterra | 2025 | NACS | 73% |
| Honda Prologue | 2024 | CCS1 | 100% |
| Honda Prologue | 2025 | NACS | 100% |
| Volvo XC40 Recharge | 2021–2024 | CCS1 | 100% |
| Volvo XC40 Recharge | 2025 | NACS | 100% |
| Volvo C40 Recharge | 2022–2024 | CCS1 | 100% |
| Volvo C40 Recharge | 2025 | NACS | 100% |
| Volvo EX90 | 2024 | CCS1 | 79% |
| Volvo EX90 | 2025 | NACS | 79% |
| Polestar Polestar 2 | 2021–2024 | CCS1 | 100% |
| Polestar Polestar 2 | 2025 | NACS | 100% |
| Polestar Polestar 3 | 2024 | CCS1 | 79% |
| Polestar Polestar 3 | 2025 | NACS | 79% |
| Mini Cooper SE | 2020–2024 | CCS1 | 100% |
| Mini Cooper SE | 2025 | NACS | 100% |
| Mazda MX-30 | 2022–2024 | CCS1 | 100% |
| Jaguar I-PACE | 2019–2024 | CCS1 | 98% |
| Lexus RZ 450e | 2023–2024 | CCS1 | 73% |
| Lexus RZ 450e | 2025 | NACS | 73% |
| Fisker Ocean | 2023–2024 | CCS1 | 78% |
| VinFast VF 8 | 2023–2024 | CCS1 | 100% |
| VinFast VF 9 | 2023–2024 | CCS1 | 72% |
Common questions from Long Lake homeowners, property managers, and business owners.
For a typical install with panel capacity available, we can complete the work within 1–2 weeks of your site assessment.
Some Long Lake communities have covenants. We review your HOA documentation and can provide a letter describing the installation scope if needed for approval.
ChargePoint Home Flex at 48A is a popular choice — it maxes out the circuit and gives you the fastest home charge speed available.
Yes. A licensed electrician must pull an electrical permit for a new Level 2 circuit. We manage permit filing, inspection coordination, and final sign-off.
Most residential projects are completed in one visit. Longer conduit runs, panel modifications, or scheduling constraints can extend total timeline.
Yes. We regularly install in detached garages, driveways, and weather-exposed areas using code-compliant wiring methods and appropriately rated equipment.
We install major residential and commercial brands including Tesla Wall Connector, ChargePoint, Emporia, Wallbox, and similar UL-listed hardware.
Reviews
Real reviews from homeowners and businesses near you.
Lakeside property with a detached garage about 60 feet from the house. Underground conduit run was clean and they restored the landscaping after trenching. Charger works at full capacity.
Simple garage install on a newer home. They were in and out in under three hours and the work is flawless. Breaker labeled, circuit tested, charger paired with the app before they left.
Had an existing 240V dryer outlet that I thought could double for the EV. They explained why that's a code violation and installed a proper dedicated circuit instead. Right way to do it.
Both cars are EVs now. They installed a dual-outlet setup with staggered charging timers so we never exceed our panel capacity. Smart planning that avoids future problems.